The project will provide a central location for a range of clinical, administrative and related functions for improved Indigenous healthcare.
Central Australian Aboriginal Congress (CAAC) are the main healthcare provider to Indigenous people in Central Australia. The new Health Hub has been designed to improve health and wellness of staff and visitors, provide a connection to Country and deliver high standards of sustainability, energy efficiency and indoor environment quality.
The project is registered to obtain 6 Star Green Star Design & As-Built Certified rating, which will be a first for Alice Springs.
The ESD features of the new healthcare building include:
- Targeting 6 Star Green Star Design and As-Built Rating
- All electric building with no fossil fuels or gas used in heating, cooling, or hot water systems, enabling Carbon Neutral operation when supplemented with an off-site renewable energy source.
- 70kW solar PV array and electric vehicle charging infrastructure for low emission fleet transition.
- Collaboration with Charles Darwin University to understand and improve construction and demolition waste diversion in Alice Springs.
- High performance building facades, inclusive of shading, optimised for energy performance and indoor comfort.
- Significant landscaping, including riverine area integrating a protected River Red Gum of cultural significance, alongside arid plant species, bush foods and medicine planting.
Location
Alice Springs, NT
Sector
Indigenous
Healthcare
Project Partners
Central Australian Aboriginal Congress (CAAC)
Susan Dugdale & Associates
Services Provided
Environmentally Sustainable Design
Strategy
Green Building Ratings
Building Performance Simulation




